{"id":15255,"date":"2023-09-22T11:00:41","date_gmt":"2023-09-22T10:00:41","guid":{"rendered":"https:\/\/grupoazvinews.com\/construcciones-urales-comienza-la-construccion-de-la-fase-1-de-la-estacion-de-santa-martha-del-trolebus-elevado\/"},"modified":"2025-10-01T15:48:08","modified_gmt":"2025-10-01T14:48:08","slug":"construcciones-urales-begins-construction-of-phase-1-of-the-santa-martha-elevated-trolleybus-station","status":"publish","type":"post","link":"https:\/\/grupoazvinews.com\/en\/construcciones-urales-begins-construction-of-phase-1-of-the-santa-martha-elevated-trolleybus-station\/","title":{"rendered":"Construcciones Urales begins construction of Phase 1 of the Santa Martha elevated trolleybus station"},"content":{"rendered":"<p>[vc_row][vc_column][vc_column_text]<\/p>\n<p data-start=\"104\" data-end=\"464\"><strong data-start=\"104\" data-end=\"462\">Construcciones Urales<\/strong> is carrying out the construction of <strong>Phase 1 of the Santa Martha station<\/strong>, part of the mass electric transportation system known as the Elevated Trolleybus. The project also includes the execution of a curved viaduct that will connect this station with Line 8 of the Trolleybus, coming from Constituci\u00f3n de 1917 station (Mexico City).<\/p>\n<p data-start=\"466\" data-end=\"675\">The project is divided into two phases, Phase 0 and Phase 1, due to the station\u2019s location at the boundary between Mexico City and the State of Mexico, and therefore managed by two different administrations.<\/p>\n<p data-start=\"677\" data-end=\"931\">Once both phases are completed, the station will also enable the interconnection of the two elevated trolleybus lines that will converge there: Line 8, connecting Constituci\u00f3n de 1917 with Santa Martha, and Line 10, connecting Santa Martha with Chalco.<\/p>\n<p data-start=\"933\" data-end=\"1195\">In addition, the Santa Martha elevated trolleybus station will form part of the <strong data-start=\"1013\" data-end=\"1060\">Modal Transfer Center (CETRAM) Santa Martha<\/strong>, which, through pedestrian walkways, will connect to the existing transport systems: metro, bus, cable car, and elevated trolleybus.<\/p>\n<h3 data-start=\"1202\" data-end=\"1255\"><\/h3>\n<h3 data-start=\"1202\" data-end=\"1255\">Construction of Phase 1 of the Elevated Station<\/h3>\n<p data-start=\"1257\" data-end=\"1343\">The construction of Phase 1 of the elevated station is developed across four levels:<\/p>\n<ul>\n<li data-start=\"1347\" data-end=\"1381\"><strong data-start=\"1347\" data-end=\"1379\">Street level \u2013 bus terminal.<\/strong><\/li>\n<li data-start=\"1384\" data-end=\"1443\"><strong data-start=\"1384\" data-end=\"1411\">Concourse\u2013walkway level<\/strong>, with a built area of 704 m\u00b2.<\/li>\n<li data-start=\"1446\" data-end=\"1509\"><strong data-start=\"1446\" data-end=\"1475\">Trolleybus platform level<\/strong>, with a built area of 1,178 m\u00b2.<\/li>\n<li data-start=\"1512\" data-end=\"1558\"><strong data-start=\"1512\" data-end=\"1526\">Roof level<\/strong>, with a built area of 581 m\u00b2.<\/li>\n<\/ul>\n<p data-start=\"1560\" data-end=\"1829\">The structure as a whole is resolved with large reinforced concrete frames, made up of columns with a section of 2.4 x 2.9 m and variable-depth beams ranging from 2 to 3 m. These support the different elevated levels, which are executed with various steel structures.<\/p>\n<p data-start=\"1831\" data-end=\"2138\">These large frames are founded on reinforced concrete pile caps, 2.5 m deep, placed at \u20136.5 m below street level. The loads are transferred to reinforced concrete piles with a 1.5 m diameter and lengths of 67.5 m. The pile caps of the different frames are braced with foundation beams measuring 2 x 2.5 m.<\/p>\n<p data-start=\"2140\" data-end=\"2180\"><strong data-start=\"2140\" data-end=\"2178\">Key figures for this work include:<\/strong><\/p>\n<ul>\n<li data-start=\"2183\" data-end=\"2220\">878 m of piles (1.5 m in diameter).<\/li>\n<li data-start=\"2223\" data-end=\"2257\">2,977 m\u00b3 of structural concrete.<\/li>\n<li data-start=\"2260\" data-end=\"2296\">844,000 kg of reinforcement steel.<\/li>\n<li data-start=\"2299\" data-end=\"2332\">548,000 kg of structural steel.<\/li>\n<\/ul>\n<h3 data-start=\"2339\" data-end=\"2390\"><\/h3>\n<h3 data-start=\"2339\" data-end=\"2390\">Construction of the Curved Connecting Viaduct<\/h3>\n<p data-start=\"2392\" data-end=\"2772\">The curved viaduct, which will connect Line 8 of the trolleybus with the Santa Martha station, has column heights of up to 15 m. It begins with a deck section wide enough for two-way trolleybus circulation. Shortly after, the deck splits into two narrower branches with one-way circulation each: the north branch and the south branch, both connecting to the station\u2019s structure.<\/p>\n<p data-start=\"2774\" data-end=\"2868\">Both branches are also linked in the central area to allow for trolleybus direction changes.<\/p>\n<ul>\n<li data-start=\"2872\" data-end=\"3037\"><strong data-start=\"2872\" data-end=\"2892\">The north branch<\/strong>, 104.56 m long, consists of a hyperstatic structure with three spans of 28.21 m, 28.44 m, and 18.22 m, plus an isostatic structure of 29.69 m.<\/li>\n<li data-start=\"3040\" data-end=\"3192\"><strong data-start=\"3040\" data-end=\"3060\">The south branch<\/strong>, 76.82 m long, consists of a hyperstatic structure with two spans of 30.92 m and 18.44 m, plus an isostatic structure of 27.76 m.<\/li>\n<\/ul>\n<p data-start=\"3194\" data-end=\"3475\">The deck typology of the viaduct (both branches and the central junction) is mixed, formed by a 25 cm thick reinforced concrete slab over a steel box girder with a depth of 1.63 m. The deck rests on variable-depth caps connected to reinforced concrete columns of variable height.<\/p>\n<p data-start=\"3477\" data-end=\"3774\">The foundation of the columns is executed with reinforced concrete pile caps, 3.75 m deep, placed at \u20138 m below street level. Each support transfers the load to the ground through six reinforced concrete piles, 1.5 m in diameter and between 64 and 74 m long, depending on the support\u2019s location.<\/p>\n<p data-start=\"3776\" data-end=\"3816\"><strong data-start=\"3776\" data-end=\"3814\">Key figures for this work include:<\/strong><\/p>\n<ul>\n<li data-start=\"3819\" data-end=\"3856\">373 m of piles (1.5 m in diameter).<\/li>\n<li data-start=\"3859\" data-end=\"3891\">479 m\u00b3 of structural concrete.<\/li>\n<li data-start=\"3894\" data-end=\"3930\">493,000 kg of reinforcement steel.<\/li>\n<li data-start=\"3933\" data-end=\"3966\">655,000 kg of structural steel.<\/li>\n<\/ul>\n<p data-start=\"3973\" data-end=\"4009\"><strong data-start=\"3973\" data-end=\"4007\">Photos: Construcciones Urales.<\/strong><\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column]<div class=\"lqd-img-gal\">\n\n\t<div class=\"lqd-img-gal-imgs\">\n\n\t\t<div class=\"carousel-container carousel-nav-floated carousel-nav-center carousel-nav-middle carousel-nav-lg carousel-nav-solid carousel-nav-circle carousel-nav-appear-onhover carousel-dots-mobile-inside\">\n\t\t\t<div class=\"carousel-items\" data-lqd-flickity='{ \"prevNextButtons\": true, \"navArrow\": \"6\", \"parallax\": true, \"adaptiveHeight\": true }' id=\"lqd-image-gallery-69e7d59e82e31main-carousel\">\n\n\t\t\t\t\t\t\t\t<div class=\"carousel-item col-xs-12 px-0\">\n\t\t\t\t\t<div class=\"carousel-item-inner\">\n\t\t\t\t\t\t<figure>\n\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"464\" src=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/SantaMarta-min-1.jpg\" class=\"attachment-full size-full\" alt=\"\" srcset=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/SantaMarta-min-1.jpg 600w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/SantaMarta-min-1-300x232.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/>\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<div class=\"carousel-item col-xs-12 px-0\">\n\t\t\t\t\t<div class=\"carousel-item-inner\">\n\t\t\t\t\t\t<figure>\n\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"4000\" height=\"3000\" src=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_110525.jpg\" class=\"attachment-full size-full\" alt=\"\" srcset=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_110525.jpg 4000w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_110525-300x225.jpg 300w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_110525-1024x768.jpg 1024w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_110525-750x563.jpg 750w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_110525-1140x855.jpg 1140w\" sizes=\"auto, (max-width: 4000px) 100vw, 4000px\" \/>\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<div class=\"carousel-item col-xs-12 px-0\">\n\t\t\t\t\t<div class=\"carousel-item-inner\">\n\t\t\t\t\t\t<figure>\n\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"4000\" height=\"3000\" src=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_105509.jpg\" class=\"attachment-full size-full\" alt=\"\" srcset=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_105509.jpg 4000w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_105509-300x225.jpg 300w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_105509-1024x768.jpg 1024w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_105509-750x563.jpg 750w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_105509-1140x855.jpg 1140w\" sizes=\"auto, (max-width: 4000px) 100vw, 4000px\" \/>\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<div class=\"carousel-item col-xs-12 px-0\">\n\t\t\t\t\t<div class=\"carousel-item-inner\">\n\t\t\t\t\t\t<figure>\n\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"4000\" height=\"3000\" src=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_105131.jpg\" class=\"attachment-full size-full\" alt=\"\" srcset=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_105131.jpg 4000w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_105131-300x225.jpg 300w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_105131-1024x768.jpg 1024w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_105131-750x563.jpg 750w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_105131-1140x855.jpg 1140w\" sizes=\"auto, (max-width: 4000px) 100vw, 4000px\" \/>\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<div class=\"carousel-item col-xs-12 px-0\">\n\t\t\t\t\t<div class=\"carousel-item-inner\">\n\t\t\t\t\t\t<figure>\n\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"4000\" height=\"3000\" src=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_111518.jpg\" class=\"attachment-full size-full\" alt=\"\" srcset=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_111518.jpg 4000w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_111518-300x225.jpg 300w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_111518-1024x768.jpg 1024w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_111518-750x563.jpg 750w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_111518-1140x855.jpg 1140w\" sizes=\"auto, (max-width: 4000px) 100vw, 4000px\" \/>\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<div class=\"carousel-item col-xs-12 px-0\">\n\t\t\t\t\t<div class=\"carousel-item-inner\">\n\t\t\t\t\t\t<figure>\n\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"200\" height=\"576\" src=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_cimentacion_columnas.jpg\" class=\"attachment-full size-full\" alt=\"\" srcset=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_cimentacion_columnas.jpg 200w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_cimentacion_columnas-104x300.jpg 104w\" sizes=\"auto, (max-width: 200px) 100vw, 200px\" \/>\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<div class=\"carousel-item col-xs-12 px-0\">\n\t\t\t\t\t<div class=\"carousel-item-inner\">\n\t\t\t\t\t\t<figure>\n\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1197\" height=\"504\" src=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_estacion_proyecto.jpg\" class=\"attachment-full size-full\" alt=\"\" srcset=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_estacion_proyecto.jpg 1197w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_estacion_proyecto-300x126.jpg 300w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_estacion_proyecto-1024x431.jpg 1024w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_estacion_proyecto-750x316.jpg 750w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_estacion_proyecto-1140x480.jpg 1140w\" sizes=\"auto, (max-width: 1197px) 100vw, 1197px\" \/>\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<div class=\"carousel-item col-xs-12 px-0\">\n\t\t\t\t\t<div class=\"carousel-item-inner\">\n\t\t\t\t\t\t<figure>\n\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"596\" height=\"333\" src=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_estacion_plano_2.jpg\" class=\"attachment-full size-full\" alt=\"\" srcset=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_estacion_plano_2.jpg 596w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_estacion_plano_2-300x168.jpg 300w\" sizes=\"auto, (max-width: 596px) 100vw, 596px\" \/>\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<div class=\"carousel-item col-xs-12 px-0\">\n\t\t\t\t\t<div class=\"carousel-item-inner\">\n\t\t\t\t\t\t<figure>\n\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1198\" height=\"628\" src=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_viaducto_curvo.jpg\" class=\"attachment-full size-full\" alt=\"\" srcset=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_viaducto_curvo.jpg 1198w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_viaducto_curvo-300x157.jpg 300w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_viaducto_curvo-1024x537.jpg 1024w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_viaducto_curvo-750x393.jpg 750w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_viaducto_curvo-1140x598.jpg 1140w\" sizes=\"auto, (max-width: 1198px) 100vw, 1198px\" \/>\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t<\/div><!-- \/.carousel-items -->\n\t\t<\/div><!-- \/.carousel-container -->\n\n\t<\/div><!-- \/.lqd-img-gal-imgs -->\n\n\t<div class=\"lqd-img-gal-thumbs\">\n\n\t\t<div class=\"carousel-container\">\n\t\t\t<div class=\"carousel-items\" data-lqd-flickity='{ \"contain\": false, \"pageDots\": false, \"asNavFor\": \"#lqd-image-gallery-69e7d59e82e31main-carousel\" }'>\n\n\t\t\t\t\t\t\t\t<div class=\"carousel-item col-xs-4 col-sm-3 col-md-2\">\n\t\t\t\t\t<div class=\"carousel-item-inner\">\n\t\t\t\t\t\t<figure>\n\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"91\" height=\"70\" src=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/SantaMarta-min-1.jpg\" class=\"attachment-160x70 size-160x70\" alt=\"\" srcset=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/SantaMarta-min-1.jpg 600w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/SantaMarta-min-1-300x232.jpg 300w\" sizes=\"auto, (max-width: 91px) 100vw, 91px\" \/>\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<div class=\"carousel-item col-xs-4 col-sm-3 col-md-2\">\n\t\t\t\t\t<div class=\"carousel-item-inner\">\n\t\t\t\t\t\t<figure>\n\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"93\" height=\"70\" src=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_110525.jpg\" class=\"attachment-160x70 size-160x70\" alt=\"\" srcset=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_110525.jpg 4000w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_110525-300x225.jpg 300w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_110525-1024x768.jpg 1024w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_110525-750x563.jpg 750w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_110525-1140x855.jpg 1140w\" sizes=\"auto, (max-width: 93px) 100vw, 93px\" \/>\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<div class=\"carousel-item col-xs-4 col-sm-3 col-md-2\">\n\t\t\t\t\t<div class=\"carousel-item-inner\">\n\t\t\t\t\t\t<figure>\n\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"93\" height=\"70\" src=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_105509.jpg\" class=\"attachment-160x70 size-160x70\" alt=\"\" srcset=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_105509.jpg 4000w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_105509-300x225.jpg 300w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_105509-1024x768.jpg 1024w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_105509-750x563.jpg 750w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_105509-1140x855.jpg 1140w\" sizes=\"auto, (max-width: 93px) 100vw, 93px\" \/>\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<div class=\"carousel-item col-xs-4 col-sm-3 col-md-2\">\n\t\t\t\t\t<div class=\"carousel-item-inner\">\n\t\t\t\t\t\t<figure>\n\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"93\" height=\"70\" src=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_105131.jpg\" class=\"attachment-160x70 size-160x70\" alt=\"\" srcset=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_105131.jpg 4000w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_105131-300x225.jpg 300w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_105131-1024x768.jpg 1024w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_105131-750x563.jpg 750w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_105131-1140x855.jpg 1140w\" sizes=\"auto, (max-width: 93px) 100vw, 93px\" \/>\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<div class=\"carousel-item col-xs-4 col-sm-3 col-md-2\">\n\t\t\t\t\t<div class=\"carousel-item-inner\">\n\t\t\t\t\t\t<figure>\n\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"93\" height=\"70\" src=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_111518.jpg\" class=\"attachment-160x70 size-160x70\" alt=\"\" srcset=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_111518.jpg 4000w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_111518-300x225.jpg 300w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_111518-1024x768.jpg 1024w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_111518-750x563.jpg 750w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/20230908_111518-1140x855.jpg 1140w\" sizes=\"auto, (max-width: 93px) 100vw, 93px\" \/>\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<div class=\"carousel-item col-xs-4 col-sm-3 col-md-2\">\n\t\t\t\t\t<div class=\"carousel-item-inner\">\n\t\t\t\t\t\t<figure>\n\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"24\" height=\"70\" src=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_cimentacion_columnas.jpg\" class=\"attachment-160x70 size-160x70\" alt=\"\" srcset=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_cimentacion_columnas.jpg 200w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_cimentacion_columnas-104x300.jpg 104w\" sizes=\"auto, (max-width: 24px) 100vw, 24px\" \/>\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<div class=\"carousel-item col-xs-4 col-sm-3 col-md-2\">\n\t\t\t\t\t<div class=\"carousel-item-inner\">\n\t\t\t\t\t\t<figure>\n\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"158\" height=\"70\" src=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_estacion_proyecto-1140x504.jpg\" class=\"attachment-160x70 size-160x70\" alt=\"\" \/>\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<div class=\"carousel-item col-xs-4 col-sm-3 col-md-2\">\n\t\t\t\t\t<div class=\"carousel-item-inner\">\n\t\t\t\t\t\t<figure>\n\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"125\" height=\"70\" src=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_estacion_plano_2.jpg\" class=\"attachment-160x70 size-160x70\" alt=\"\" srcset=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_estacion_plano_2.jpg 596w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_estacion_plano_2-300x168.jpg 300w\" sizes=\"auto, (max-width: 125px) 100vw, 125px\" \/>\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<div class=\"carousel-item col-xs-4 col-sm-3 col-md-2\">\n\t\t\t\t\t<div class=\"carousel-item-inner\">\n\t\t\t\t\t\t<figure>\n\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"134\" height=\"70\" src=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_viaducto_curvo.jpg\" class=\"attachment-160x70 size-160x70\" alt=\"\" srcset=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_viaducto_curvo.jpg 1198w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_viaducto_curvo-300x157.jpg 300w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_viaducto_curvo-1024x537.jpg 1024w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_viaducto_curvo-750x393.jpg 750w, https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/Santa_Marta_viaducto_curvo-1140x598.jpg 1140w\" sizes=\"auto, (max-width: 134px) 100vw, 134px\" \/>\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t<\/div><!-- \/.carousel-items -->\n\t\t<\/div><!-- \/.carousel-container -->\n\n\t<\/div><!-- \/.lqd-img-gal-thumbs -->\n\n<\/div><!-- \/.lqd-img-gal -->[\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text] Construcciones Urales is carrying out the construction of Phase 1 of the Santa Martha station, part of the mass electric transportation system known as the Elevated Trolleybus. The project also includes the execution of a curved viaduct that will connect this station with Line 8 of the Trolleybus, coming from Constituci\u00f3n de 1917 station [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":14575,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1130],"tags":[1128,1135,1141],"class_list":["post-15255","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-infrastructure","tag-azvi-en","tag-construcciones-urales-en","tag-urban-transport"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construcciones Urales begins construction of Phase 1 of the Santa Martha elevated trolleybus station<\/title>\n<meta name=\"description\" content=\"Construcciones Urales begins construction of Phase 1 of the Santa Martha elevated trolleybus station.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/grupoazvinews.com\/en\/construcciones-urales-begins-construction-of-phase-1-of-the-santa-martha-elevated-trolleybus-station\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construcciones Urales begins construction of Phase 1 of the Santa Martha elevated trolleybus station\" \/>\n<meta property=\"og:description\" content=\"Construcciones Urales begins construction of Phase 1 of the Santa Martha elevated trolleybus station.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/grupoazvinews.com\/en\/construcciones-urales-begins-construction-of-phase-1-of-the-santa-martha-elevated-trolleybus-station\/\" \/>\n<meta property=\"og:site_name\" content=\"NOTICIAS Grupo Azvi\" \/>\n<meta property=\"article:published_time\" content=\"2023-09-22T10:00:41+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-01T14:48:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/SantaMarta-min.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"464\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"goodland\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"goodland\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/grupoazvinews.com\/en\/construcciones-urales-begins-construction-of-phase-1-of-the-santa-martha-elevated-trolleybus-station\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/grupoazvinews.com\/en\/construcciones-urales-begins-construction-of-phase-1-of-the-santa-martha-elevated-trolleybus-station\/\"},\"author\":{\"name\":\"goodland\",\"@id\":\"https:\/\/grupoazvinews.com\/en\/#\/schema\/person\/47d326184eb90ffcc4d0639026a97ad8\"},\"headline\":\"Construcciones Urales begins construction of Phase 1 of the Santa Martha elevated trolleybus station\",\"datePublished\":\"2023-09-22T10:00:41+00:00\",\"dateModified\":\"2025-10-01T14:48:08+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/grupoazvinews.com\/en\/construcciones-urales-begins-construction-of-phase-1-of-the-santa-martha-elevated-trolleybus-station\/\"},\"wordCount\":614,\"publisher\":{\"@id\":\"https:\/\/grupoazvinews.com\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/grupoazvinews.com\/en\/construcciones-urales-begins-construction-of-phase-1-of-the-santa-martha-elevated-trolleybus-station\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/SantaMarta-min.jpg\",\"keywords\":[\"Azvi\",\"Construcciones Urales\",\"Urban transport\"],\"articleSection\":[\"Infrastructure\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/grupoazvinews.com\/en\/construcciones-urales-begins-construction-of-phase-1-of-the-santa-martha-elevated-trolleybus-station\/\",\"url\":\"https:\/\/grupoazvinews.com\/en\/construcciones-urales-begins-construction-of-phase-1-of-the-santa-martha-elevated-trolleybus-station\/\",\"name\":\"Construcciones Urales begins construction of Phase 1 of the Santa Martha elevated trolleybus station\",\"isPartOf\":{\"@id\":\"https:\/\/grupoazvinews.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/grupoazvinews.com\/en\/construcciones-urales-begins-construction-of-phase-1-of-the-santa-martha-elevated-trolleybus-station\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/grupoazvinews.com\/en\/construcciones-urales-begins-construction-of-phase-1-of-the-santa-martha-elevated-trolleybus-station\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/SantaMarta-min.jpg\",\"datePublished\":\"2023-09-22T10:00:41+00:00\",\"dateModified\":\"2025-10-01T14:48:08+00:00\",\"description\":\"Construcciones Urales begins construction of Phase 1 of the Santa Martha elevated trolleybus station.\",\"breadcrumb\":{\"@id\":\"https:\/\/grupoazvinews.com\/en\/construcciones-urales-begins-construction-of-phase-1-of-the-santa-martha-elevated-trolleybus-station\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/grupoazvinews.com\/en\/construcciones-urales-begins-construction-of-phase-1-of-the-santa-martha-elevated-trolleybus-station\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/grupoazvinews.com\/en\/construcciones-urales-begins-construction-of-phase-1-of-the-santa-martha-elevated-trolleybus-station\/#primaryimage\",\"url\":\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/SantaMarta-min.jpg\",\"contentUrl\":\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/SantaMarta-min.jpg\",\"width\":600,\"height\":464},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/grupoazvinews.com\/en\/construcciones-urales-begins-construction-of-phase-1-of-the-santa-martha-elevated-trolleybus-station\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/grupoazvinews.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construcciones Urales begins construction of Phase 1 of the Santa Martha elevated trolleybus station\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/grupoazvinews.com\/en\/#website\",\"url\":\"https:\/\/grupoazvinews.com\/en\/\",\"name\":\"Grupo Azvi News\",\"description\":\"Grupo Azvi es una empresa centenaria cuyos or\u00edgenes e historia han estado estrechamente vinculados al desarrollo de las infraestructuras de nuestro pa\u00eds. Hoy, se ha convertido en la empresa l\u00edder de un grupo internacional, innovador, diversificado y sostenible.\",\"publisher\":{\"@id\":\"https:\/\/grupoazvinews.com\/en\/#organization\"},\"alternateName\":\"Blog de noticias del Grupo Azvi\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/grupoazvinews.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/grupoazvinews.com\/en\/#organization\",\"name\":\"Grupo Azvi\",\"alternateName\":\"Grupo Azvi\",\"url\":\"https:\/\/grupoazvinews.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/grupoazvinews.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2024\/04\/GrupoAzvi-2018-transp-1.png\",\"contentUrl\":\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2024\/04\/GrupoAzvi-2018-transp-1.png\",\"width\":1722,\"height\":486,\"caption\":\"Grupo Azvi\"},\"image\":{\"@id\":\"https:\/\/grupoazvinews.com\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/grupoazvinews.com\/en\/#\/schema\/person\/47d326184eb90ffcc4d0639026a97ad8\",\"name\":\"goodland\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/grupoazvinews.com\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/f89fbdeea90efcd70c8b111757e06da47bd4b3a0a656926dbd45ddeed84e25ca?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/f89fbdeea90efcd70c8b111757e06da47bd4b3a0a656926dbd45ddeed84e25ca?s=96&d=mm&r=g\",\"caption\":\"goodland\"},\"sameAs\":[\"https:\/\/grupoazvinews.com\"],\"url\":\"https:\/\/grupoazvinews.com\/en\/author\/goodland\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construcciones Urales begins construction of Phase 1 of the Santa Martha elevated trolleybus station","description":"Construcciones Urales begins construction of Phase 1 of the Santa Martha elevated trolleybus station.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/grupoazvinews.com\/en\/construcciones-urales-begins-construction-of-phase-1-of-the-santa-martha-elevated-trolleybus-station\/","og_locale":"en_US","og_type":"article","og_title":"Construcciones Urales begins construction of Phase 1 of the Santa Martha elevated trolleybus station","og_description":"Construcciones Urales begins construction of Phase 1 of the Santa Martha elevated trolleybus station.","og_url":"https:\/\/grupoazvinews.com\/en\/construcciones-urales-begins-construction-of-phase-1-of-the-santa-martha-elevated-trolleybus-station\/","og_site_name":"NOTICIAS Grupo Azvi","article_published_time":"2023-09-22T10:00:41+00:00","article_modified_time":"2025-10-01T14:48:08+00:00","og_image":[{"width":600,"height":464,"url":"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/SantaMarta-min.jpg","type":"image\/jpeg"}],"author":"goodland","twitter_card":"summary_large_image","twitter_misc":{"Written by":"goodland","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/grupoazvinews.com\/en\/construcciones-urales-begins-construction-of-phase-1-of-the-santa-martha-elevated-trolleybus-station\/#article","isPartOf":{"@id":"https:\/\/grupoazvinews.com\/en\/construcciones-urales-begins-construction-of-phase-1-of-the-santa-martha-elevated-trolleybus-station\/"},"author":{"name":"goodland","@id":"https:\/\/grupoazvinews.com\/en\/#\/schema\/person\/47d326184eb90ffcc4d0639026a97ad8"},"headline":"Construcciones Urales begins construction of Phase 1 of the Santa Martha elevated trolleybus station","datePublished":"2023-09-22T10:00:41+00:00","dateModified":"2025-10-01T14:48:08+00:00","mainEntityOfPage":{"@id":"https:\/\/grupoazvinews.com\/en\/construcciones-urales-begins-construction-of-phase-1-of-the-santa-martha-elevated-trolleybus-station\/"},"wordCount":614,"publisher":{"@id":"https:\/\/grupoazvinews.com\/en\/#organization"},"image":{"@id":"https:\/\/grupoazvinews.com\/en\/construcciones-urales-begins-construction-of-phase-1-of-the-santa-martha-elevated-trolleybus-station\/#primaryimage"},"thumbnailUrl":"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/SantaMarta-min.jpg","keywords":["Azvi","Construcciones Urales","Urban transport"],"articleSection":["Infrastructure"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/grupoazvinews.com\/en\/construcciones-urales-begins-construction-of-phase-1-of-the-santa-martha-elevated-trolleybus-station\/","url":"https:\/\/grupoazvinews.com\/en\/construcciones-urales-begins-construction-of-phase-1-of-the-santa-martha-elevated-trolleybus-station\/","name":"Construcciones Urales begins construction of Phase 1 of the Santa Martha elevated trolleybus station","isPartOf":{"@id":"https:\/\/grupoazvinews.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/grupoazvinews.com\/en\/construcciones-urales-begins-construction-of-phase-1-of-the-santa-martha-elevated-trolleybus-station\/#primaryimage"},"image":{"@id":"https:\/\/grupoazvinews.com\/en\/construcciones-urales-begins-construction-of-phase-1-of-the-santa-martha-elevated-trolleybus-station\/#primaryimage"},"thumbnailUrl":"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/SantaMarta-min.jpg","datePublished":"2023-09-22T10:00:41+00:00","dateModified":"2025-10-01T14:48:08+00:00","description":"Construcciones Urales begins construction of Phase 1 of the Santa Martha elevated trolleybus station.","breadcrumb":{"@id":"https:\/\/grupoazvinews.com\/en\/construcciones-urales-begins-construction-of-phase-1-of-the-santa-martha-elevated-trolleybus-station\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/grupoazvinews.com\/en\/construcciones-urales-begins-construction-of-phase-1-of-the-santa-martha-elevated-trolleybus-station\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/grupoazvinews.com\/en\/construcciones-urales-begins-construction-of-phase-1-of-the-santa-martha-elevated-trolleybus-station\/#primaryimage","url":"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/SantaMarta-min.jpg","contentUrl":"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/09\/SantaMarta-min.jpg","width":600,"height":464},{"@type":"BreadcrumbList","@id":"https:\/\/grupoazvinews.com\/en\/construcciones-urales-begins-construction-of-phase-1-of-the-santa-martha-elevated-trolleybus-station\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/grupoazvinews.com\/en\/"},{"@type":"ListItem","position":2,"name":"Construcciones Urales begins construction of Phase 1 of the Santa Martha elevated trolleybus station"}]},{"@type":"WebSite","@id":"https:\/\/grupoazvinews.com\/en\/#website","url":"https:\/\/grupoazvinews.com\/en\/","name":"Grupo Azvi News","description":"Grupo Azvi es una empresa centenaria cuyos or\u00edgenes e historia han estado estrechamente vinculados al desarrollo de las infraestructuras de nuestro pa\u00eds. Hoy, se ha convertido en la empresa l\u00edder de un grupo internacional, innovador, diversificado y sostenible.","publisher":{"@id":"https:\/\/grupoazvinews.com\/en\/#organization"},"alternateName":"Blog de noticias del Grupo Azvi","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/grupoazvinews.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/grupoazvinews.com\/en\/#organization","name":"Grupo Azvi","alternateName":"Grupo Azvi","url":"https:\/\/grupoazvinews.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/grupoazvinews.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2024\/04\/GrupoAzvi-2018-transp-1.png","contentUrl":"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2024\/04\/GrupoAzvi-2018-transp-1.png","width":1722,"height":486,"caption":"Grupo Azvi"},"image":{"@id":"https:\/\/grupoazvinews.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/grupoazvinews.com\/en\/#\/schema\/person\/47d326184eb90ffcc4d0639026a97ad8","name":"goodland","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/grupoazvinews.com\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/f89fbdeea90efcd70c8b111757e06da47bd4b3a0a656926dbd45ddeed84e25ca?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f89fbdeea90efcd70c8b111757e06da47bd4b3a0a656926dbd45ddeed84e25ca?s=96&d=mm&r=g","caption":"goodland"},"sameAs":["https:\/\/grupoazvinews.com"],"url":"https:\/\/grupoazvinews.com\/en\/author\/goodland\/"}]}},"_links":{"self":[{"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/posts\/15255","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/comments?post=15255"}],"version-history":[{"count":3,"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/posts\/15255\/revisions"}],"predecessor-version":[{"id":19051,"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/posts\/15255\/revisions\/19051"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/media\/14575"}],"wp:attachment":[{"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/media?parent=15255"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/categories?post=15255"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/tags?post=15255"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}