{"id":15318,"date":"2023-02-06T15:46:34","date_gmt":"2023-02-06T13:46:34","guid":{"rendered":"https:\/\/grupoazvinews.com\/azvi-construira-la-plataforma-de-la-linea-de-alta-velocidad-entre-murcia-y-cartagena-en-el-tramo-riquelme-torre-pacheco\/"},"modified":"2025-10-23T12:12:19","modified_gmt":"2025-10-23T10:12:19","slug":"azvi-to-build-the-platform-for-the-riquelme-torre-pacheco-section-of-the-high-speed-line-between-murcia-and-cartagena","status":"publish","type":"post","link":"https:\/\/grupoazvinews.com\/en\/azvi-to-build-the-platform-for-the-riquelme-torre-pacheco-section-of-the-high-speed-line-between-murcia-and-cartagena\/","title":{"rendered":"Azvi to build the platform for the Riquelme-Torre Pacheco section of the high-speed line between Murcia and Cartagena."},"content":{"rendered":"<p>[vc_row][vc_column][vc_column_text]<\/p>\n<ul>\n<li><span data-contrast=\"auto\">In a joint venture with Acciona, Azvi will build this 17.7 km section of standard gauge double track, which will have seven viaducts and 12 overpasses.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Adif will invest more than 133 million Euros in the high-speed connection between Murcia and Cartagena<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-contrast=\"auto\">Azvi and Acciona have been awarded the platform construction works of the Riquelme-Torre Pacheco section, which plays a key role in this strategic connection between the two cities in the Region of Murcia and connects Cartagena with the Mediterranean Corridor, in line with the commitments made by the Ministry of Transport, Mobility and Urban Agenda (Mitma).<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The section to be built runs along 17.7 km through the municipalities of Murcia and Torre Pacheco and defines a new high-speed double-track platform in standard gauge (1,435 mm) parallel to the current Chinchilla-Cartagena line, in conventional gauge (1,668 mm).<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Seven viaducts with a total length of 347 m, 12 overpasses, one underpass and 44 transversal drainage works are planned along the route. The project also includes various extension and remodelling works at the Balsicas-Mar Menor and Torre-Pacheco stations.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">These works contribute to achieving Sustainable Development Goal (SDG) number 9, which is to develop reliable, sustainable and quality infrastructures.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The platform construction works on the Riquelme-Torre Pacheco section are funded through the &#8220;Recovery, Transformation and Resilience Plan. Funded by the European Union &#8211; NextGenerationEU&#8221;.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-size: 14px;\">Photo: Azvi<\/span>[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text] In a joint venture with Acciona, Azvi will build this 17.7 km section of standard gauge double track, which will have seven viaducts and 12 overpasses.\u00a0 Adif will invest more than 133 million Euros in the high-speed connection between Murcia and Cartagena\u00a0 Azvi and Acciona have been awarded the platform construction works of the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":14726,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1127],"tags":[1128,1136],"class_list":["post-15318","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-railway","tag-azvi-en","tag-high-speed"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Azvi construir\u00e1 la plataforma de la l\u00ednea de Alta Velocidad entre Murcia y Cartagena<\/title>\n<meta name=\"description\" content=\"En UTE con Acciona, ejecutar\u00e1 este tramo de 17,7 km de v\u00eda doble en ancho est\u00e1ndar y que contar\u00e1 con siete viaductos y 12 pasos superiores Adif invertir\u00e1 m\u00e1s\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/grupoazvinews.com\/en\/azvi-to-build-the-platform-for-the-riquelme-torre-pacheco-section-of-the-high-speed-line-between-murcia-and-cartagena\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Azvi construir\u00e1 la plataforma de la l\u00ednea de Alta Velocidad entre Murcia y Cartagena\" \/>\n<meta property=\"og:description\" content=\"En UTE con Acciona, ejecutar\u00e1 este tramo de 17,7 km de v\u00eda doble en ancho est\u00e1ndar y que contar\u00e1 con siete viaductos y 12 pasos superiores Adif invertir\u00e1 m\u00e1s\" \/>\n<meta property=\"og:url\" content=\"https:\/\/grupoazvinews.com\/en\/azvi-to-build-the-platform-for-the-riquelme-torre-pacheco-section-of-the-high-speed-line-between-murcia-and-cartagena\/\" \/>\n<meta property=\"og:site_name\" content=\"NOTICIAS Grupo Azvi\" \/>\n<meta property=\"article:published_time\" content=\"2023-02-06T13:46:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-23T10:12:19+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/02\/1-cred-SP.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"750\" \/>\n\t<meta property=\"og:image:height\" content=\"500\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"goodland\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"goodland\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/grupoazvinews.com\/en\/azvi-to-build-the-platform-for-the-riquelme-torre-pacheco-section-of-the-high-speed-line-between-murcia-and-cartagena\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/grupoazvinews.com\/en\/azvi-to-build-the-platform-for-the-riquelme-torre-pacheco-section-of-the-high-speed-line-between-murcia-and-cartagena\/\"},\"author\":{\"name\":\"goodland\",\"@id\":\"https:\/\/grupoazvinews.com\/en\/#\/schema\/person\/47d326184eb90ffcc4d0639026a97ad8\"},\"headline\":\"Azvi to build the platform for the Riquelme-Torre Pacheco section of the high-speed line between Murcia and Cartagena.\",\"datePublished\":\"2023-02-06T13:46:34+00:00\",\"dateModified\":\"2025-10-23T10:12:19+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/grupoazvinews.com\/en\/azvi-to-build-the-platform-for-the-riquelme-torre-pacheco-section-of-the-high-speed-line-between-murcia-and-cartagena\/\"},\"wordCount\":247,\"publisher\":{\"@id\":\"https:\/\/grupoazvinews.com\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/grupoazvinews.com\/en\/azvi-to-build-the-platform-for-the-riquelme-torre-pacheco-section-of-the-high-speed-line-between-murcia-and-cartagena\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/02\/1-cred-SP.jpg\",\"keywords\":[\"Azvi\",\"High Speed\"],\"articleSection\":[\"Railway\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/grupoazvinews.com\/en\/azvi-to-build-the-platform-for-the-riquelme-torre-pacheco-section-of-the-high-speed-line-between-murcia-and-cartagena\/\",\"url\":\"https:\/\/grupoazvinews.com\/en\/azvi-to-build-the-platform-for-the-riquelme-torre-pacheco-section-of-the-high-speed-line-between-murcia-and-cartagena\/\",\"name\":\"Azvi construir\u00e1 la plataforma de la l\u00ednea de Alta Velocidad entre Murcia y Cartagena\",\"isPartOf\":{\"@id\":\"https:\/\/grupoazvinews.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/grupoazvinews.com\/en\/azvi-to-build-the-platform-for-the-riquelme-torre-pacheco-section-of-the-high-speed-line-between-murcia-and-cartagena\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/grupoazvinews.com\/en\/azvi-to-build-the-platform-for-the-riquelme-torre-pacheco-section-of-the-high-speed-line-between-murcia-and-cartagena\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/02\/1-cred-SP.jpg\",\"datePublished\":\"2023-02-06T13:46:34+00:00\",\"dateModified\":\"2025-10-23T10:12:19+00:00\",\"description\":\"En UTE con Acciona, ejecutar\u00e1 este tramo de 17,7 km de v\u00eda doble en ancho est\u00e1ndar y que contar\u00e1 con siete viaductos y 12 pasos superiores Adif invertir\u00e1 m\u00e1s\",\"breadcrumb\":{\"@id\":\"https:\/\/grupoazvinews.com\/en\/azvi-to-build-the-platform-for-the-riquelme-torre-pacheco-section-of-the-high-speed-line-between-murcia-and-cartagena\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/grupoazvinews.com\/en\/azvi-to-build-the-platform-for-the-riquelme-torre-pacheco-section-of-the-high-speed-line-between-murcia-and-cartagena\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/grupoazvinews.com\/en\/azvi-to-build-the-platform-for-the-riquelme-torre-pacheco-section-of-the-high-speed-line-between-murcia-and-cartagena\/#primaryimage\",\"url\":\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/02\/1-cred-SP.jpg\",\"contentUrl\":\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/02\/1-cred-SP.jpg\",\"width\":750,\"height\":500,\"caption\":\"DCIM100MEDIADJI_0227.JPG\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/grupoazvinews.com\/en\/azvi-to-build-the-platform-for-the-riquelme-torre-pacheco-section-of-the-high-speed-line-between-murcia-and-cartagena\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/grupoazvinews.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Azvi to build the platform for the Riquelme-Torre Pacheco section of the high-speed line between Murcia and Cartagena.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/grupoazvinews.com\/en\/#website\",\"url\":\"https:\/\/grupoazvinews.com\/en\/\",\"name\":\"Grupo Azvi News\",\"description\":\"Grupo Azvi es una empresa centenaria cuyos or\u00edgenes e historia han estado estrechamente vinculados al desarrollo de las infraestructuras de nuestro pa\u00eds. Hoy, se ha convertido en la empresa l\u00edder de un grupo internacional, innovador, diversificado y sostenible.\",\"publisher\":{\"@id\":\"https:\/\/grupoazvinews.com\/en\/#organization\"},\"alternateName\":\"Blog de noticias del Grupo Azvi\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/grupoazvinews.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/grupoazvinews.com\/en\/#organization\",\"name\":\"Grupo Azvi\",\"alternateName\":\"Grupo Azvi\",\"url\":\"https:\/\/grupoazvinews.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/grupoazvinews.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2024\/04\/GrupoAzvi-2018-transp-1.png\",\"contentUrl\":\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2024\/04\/GrupoAzvi-2018-transp-1.png\",\"width\":1722,\"height\":486,\"caption\":\"Grupo Azvi\"},\"image\":{\"@id\":\"https:\/\/grupoazvinews.com\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/grupoazvinews.com\/en\/#\/schema\/person\/47d326184eb90ffcc4d0639026a97ad8\",\"name\":\"goodland\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/grupoazvinews.com\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/f89fbdeea90efcd70c8b111757e06da47bd4b3a0a656926dbd45ddeed84e25ca?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/f89fbdeea90efcd70c8b111757e06da47bd4b3a0a656926dbd45ddeed84e25ca?s=96&d=mm&r=g\",\"caption\":\"goodland\"},\"sameAs\":[\"https:\/\/grupoazvinews.com\"],\"url\":\"https:\/\/grupoazvinews.com\/en\/author\/goodland\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Azvi construir\u00e1 la plataforma de la l\u00ednea de Alta Velocidad entre Murcia y Cartagena","description":"En UTE con Acciona, ejecutar\u00e1 este tramo de 17,7 km de v\u00eda doble en ancho est\u00e1ndar y que contar\u00e1 con siete viaductos y 12 pasos superiores Adif invertir\u00e1 m\u00e1s","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/grupoazvinews.com\/en\/azvi-to-build-the-platform-for-the-riquelme-torre-pacheco-section-of-the-high-speed-line-between-murcia-and-cartagena\/","og_locale":"en_US","og_type":"article","og_title":"Azvi construir\u00e1 la plataforma de la l\u00ednea de Alta Velocidad entre Murcia y Cartagena","og_description":"En UTE con Acciona, ejecutar\u00e1 este tramo de 17,7 km de v\u00eda doble en ancho est\u00e1ndar y que contar\u00e1 con siete viaductos y 12 pasos superiores Adif invertir\u00e1 m\u00e1s","og_url":"https:\/\/grupoazvinews.com\/en\/azvi-to-build-the-platform-for-the-riquelme-torre-pacheco-section-of-the-high-speed-line-between-murcia-and-cartagena\/","og_site_name":"NOTICIAS Grupo Azvi","article_published_time":"2023-02-06T13:46:34+00:00","article_modified_time":"2025-10-23T10:12:19+00:00","og_image":[{"width":750,"height":500,"url":"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/02\/1-cred-SP.jpg","type":"image\/jpeg"}],"author":"goodland","twitter_card":"summary_large_image","twitter_misc":{"Written by":"goodland","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/grupoazvinews.com\/en\/azvi-to-build-the-platform-for-the-riquelme-torre-pacheco-section-of-the-high-speed-line-between-murcia-and-cartagena\/#article","isPartOf":{"@id":"https:\/\/grupoazvinews.com\/en\/azvi-to-build-the-platform-for-the-riquelme-torre-pacheco-section-of-the-high-speed-line-between-murcia-and-cartagena\/"},"author":{"name":"goodland","@id":"https:\/\/grupoazvinews.com\/en\/#\/schema\/person\/47d326184eb90ffcc4d0639026a97ad8"},"headline":"Azvi to build the platform for the Riquelme-Torre Pacheco section of the high-speed line between Murcia and Cartagena.","datePublished":"2023-02-06T13:46:34+00:00","dateModified":"2025-10-23T10:12:19+00:00","mainEntityOfPage":{"@id":"https:\/\/grupoazvinews.com\/en\/azvi-to-build-the-platform-for-the-riquelme-torre-pacheco-section-of-the-high-speed-line-between-murcia-and-cartagena\/"},"wordCount":247,"publisher":{"@id":"https:\/\/grupoazvinews.com\/en\/#organization"},"image":{"@id":"https:\/\/grupoazvinews.com\/en\/azvi-to-build-the-platform-for-the-riquelme-torre-pacheco-section-of-the-high-speed-line-between-murcia-and-cartagena\/#primaryimage"},"thumbnailUrl":"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/02\/1-cred-SP.jpg","keywords":["Azvi","High Speed"],"articleSection":["Railway"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/grupoazvinews.com\/en\/azvi-to-build-the-platform-for-the-riquelme-torre-pacheco-section-of-the-high-speed-line-between-murcia-and-cartagena\/","url":"https:\/\/grupoazvinews.com\/en\/azvi-to-build-the-platform-for-the-riquelme-torre-pacheco-section-of-the-high-speed-line-between-murcia-and-cartagena\/","name":"Azvi construir\u00e1 la plataforma de la l\u00ednea de Alta Velocidad entre Murcia y Cartagena","isPartOf":{"@id":"https:\/\/grupoazvinews.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/grupoazvinews.com\/en\/azvi-to-build-the-platform-for-the-riquelme-torre-pacheco-section-of-the-high-speed-line-between-murcia-and-cartagena\/#primaryimage"},"image":{"@id":"https:\/\/grupoazvinews.com\/en\/azvi-to-build-the-platform-for-the-riquelme-torre-pacheco-section-of-the-high-speed-line-between-murcia-and-cartagena\/#primaryimage"},"thumbnailUrl":"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/02\/1-cred-SP.jpg","datePublished":"2023-02-06T13:46:34+00:00","dateModified":"2025-10-23T10:12:19+00:00","description":"En UTE con Acciona, ejecutar\u00e1 este tramo de 17,7 km de v\u00eda doble en ancho est\u00e1ndar y que contar\u00e1 con siete viaductos y 12 pasos superiores Adif invertir\u00e1 m\u00e1s","breadcrumb":{"@id":"https:\/\/grupoazvinews.com\/en\/azvi-to-build-the-platform-for-the-riquelme-torre-pacheco-section-of-the-high-speed-line-between-murcia-and-cartagena\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/grupoazvinews.com\/en\/azvi-to-build-the-platform-for-the-riquelme-torre-pacheco-section-of-the-high-speed-line-between-murcia-and-cartagena\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/grupoazvinews.com\/en\/azvi-to-build-the-platform-for-the-riquelme-torre-pacheco-section-of-the-high-speed-line-between-murcia-and-cartagena\/#primaryimage","url":"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/02\/1-cred-SP.jpg","contentUrl":"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2023\/02\/1-cred-SP.jpg","width":750,"height":500,"caption":"DCIM100MEDIADJI_0227.JPG"},{"@type":"BreadcrumbList","@id":"https:\/\/grupoazvinews.com\/en\/azvi-to-build-the-platform-for-the-riquelme-torre-pacheco-section-of-the-high-speed-line-between-murcia-and-cartagena\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/grupoazvinews.com\/en\/"},{"@type":"ListItem","position":2,"name":"Azvi to build the platform for the Riquelme-Torre Pacheco section of the high-speed line between Murcia and Cartagena."}]},{"@type":"WebSite","@id":"https:\/\/grupoazvinews.com\/en\/#website","url":"https:\/\/grupoazvinews.com\/en\/","name":"Grupo Azvi News","description":"Grupo Azvi es una empresa centenaria cuyos or\u00edgenes e historia han estado estrechamente vinculados al desarrollo de las infraestructuras de nuestro pa\u00eds. Hoy, se ha convertido en la empresa l\u00edder de un grupo internacional, innovador, diversificado y sostenible.","publisher":{"@id":"https:\/\/grupoazvinews.com\/en\/#organization"},"alternateName":"Blog de noticias del Grupo Azvi","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/grupoazvinews.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/grupoazvinews.com\/en\/#organization","name":"Grupo Azvi","alternateName":"Grupo Azvi","url":"https:\/\/grupoazvinews.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/grupoazvinews.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2024\/04\/GrupoAzvi-2018-transp-1.png","contentUrl":"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2024\/04\/GrupoAzvi-2018-transp-1.png","width":1722,"height":486,"caption":"Grupo Azvi"},"image":{"@id":"https:\/\/grupoazvinews.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/grupoazvinews.com\/en\/#\/schema\/person\/47d326184eb90ffcc4d0639026a97ad8","name":"goodland","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/grupoazvinews.com\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/f89fbdeea90efcd70c8b111757e06da47bd4b3a0a656926dbd45ddeed84e25ca?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f89fbdeea90efcd70c8b111757e06da47bd4b3a0a656926dbd45ddeed84e25ca?s=96&d=mm&r=g","caption":"goodland"},"sameAs":["https:\/\/grupoazvinews.com"],"url":"https:\/\/grupoazvinews.com\/en\/author\/goodland\/"}]}},"_links":{"self":[{"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/posts\/15318","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/comments?post=15318"}],"version-history":[{"count":2,"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/posts\/15318\/revisions"}],"predecessor-version":[{"id":19267,"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/posts\/15318\/revisions\/19267"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/media\/14726"}],"wp:attachment":[{"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/media?parent=15318"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/categories?post=15318"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/tags?post=15318"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}