{"id":15497,"date":"2022-02-11T11:44:19","date_gmt":"2022-02-11T09:44:19","guid":{"rendered":"https:\/\/grupoazvinews.com\/?p=15497"},"modified":"2025-11-06T17:24:15","modified_gmt":"2025-11-06T15:24:15","slug":"azvi-begins-work-on-the-extension-of-line-3-of-the-madrid-metro-to-getafe","status":"publish","type":"post","link":"https:\/\/grupoazvinews.com\/en\/azvi-begins-work-on-the-extension-of-line-3-of-the-madrid-metro-to-getafe\/","title":{"rendered":"Azvi begins work on the extension of Line 3 of the Madrid Metro to Getafe"},"content":{"rendered":"<p>[vc_row][vc_column][vc_column_text]The consortium formed by <strong>Azvi<\/strong>, <strong>Obras Subterr\u00e1neas<\/strong> and <strong>Cotodisa<\/strong> has begun work on the <strong>extension of Line 3 of the Madrid Metro from Villaverde Alto station (Madrid) to El Casar (Getafe).<\/strong><\/p>\n<p>Awarded by the <strong>Community of Madrid<\/strong>, the project has a budget of \u20ac92 million, sourced from European Union Recovery funds.<\/p>\n<p>This extension is 2,624 metres long, of which 2,135 metres will be constructed using the <strong>Belgian method<\/strong> (traditional in Madrid) and <strong>between screens<\/strong> the existing 120 metres to the start of the new El Casar station.<\/p>\n<p>El Casar will be a new intermodal area for Getafe, as it will have an interchange that will house Madrid Metro line 3 and MetroSur line 12, the Renfe commuter train service and connections to various local bus routes. The station will be 130 metres long and 34 metres wide, and will have two levels: the lobby and the platforms, which will be excavated 14 metres below street level. Passengers will access the platforms via three lifts, six escalators and three fixed staircases.[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text]The consortium formed by Azvi, Obras Subterr\u00e1neas and Cotodisa has begun work on the extension of Line 3 of the Madrid Metro from Villaverde Alto station (Madrid) to El Casar (Getafe). Awarded by the Community of Madrid, the project has a budget of \u20ac92 million, sourced from European Union Recovery funds. This extension is 2,624 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":14916,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1130],"tags":[1128,1141],"class_list":["post-15497","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-infrastructure","tag-azvi-en","tag-urban-transport"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Azvi begins work on the extension of Line 3 of the Madrid Metro to Getafe<\/title>\n<meta name=\"description\" content=\"Azvi, Obras Subterr\u00e1neas and Cotodisa has begun work on the extension of Line 3 of the Madrid Metro from Villaverde Alto (Madrid) to El Casar (Getafe).\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/grupoazvinews.com\/en\/azvi-begins-work-on-the-extension-of-line-3-of-the-madrid-metro-to-getafe\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Azvi begins work on the extension of Line 3 of the Madrid Metro to Getafe\" \/>\n<meta property=\"og:description\" content=\"Azvi, Obras Subterr\u00e1neas and Cotodisa has begun work on the extension of Line 3 of the Madrid Metro from Villaverde Alto (Madrid) to El Casar (Getafe).\" \/>\n<meta property=\"og:url\" content=\"https:\/\/grupoazvinews.com\/en\/azvi-begins-work-on-the-extension-of-line-3-of-the-madrid-metro-to-getafe\/\" \/>\n<meta property=\"og:site_name\" content=\"NOTICIAS Grupo Azvi\" \/>\n<meta property=\"article:published_time\" content=\"2022-02-11T09:44:19+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-11-06T15:24:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2022\/02\/Azvi_MetroMadrid_L3.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"627\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"goodland\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"goodland\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/grupoazvinews.com\/en\/azvi-begins-work-on-the-extension-of-line-3-of-the-madrid-metro-to-getafe\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/grupoazvinews.com\/en\/azvi-begins-work-on-the-extension-of-line-3-of-the-madrid-metro-to-getafe\/\"},\"author\":{\"name\":\"goodland\",\"@id\":\"https:\/\/grupoazvinews.com\/en\/#\/schema\/person\/47d326184eb90ffcc4d0639026a97ad8\"},\"headline\":\"Azvi begins work on the extension of Line 3 of the Madrid Metro to Getafe\",\"datePublished\":\"2022-02-11T09:44:19+00:00\",\"dateModified\":\"2025-11-06T15:24:15+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/grupoazvinews.com\/en\/azvi-begins-work-on-the-extension-of-line-3-of-the-madrid-metro-to-getafe\/\"},\"wordCount\":189,\"publisher\":{\"@id\":\"https:\/\/grupoazvinews.com\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/grupoazvinews.com\/en\/azvi-begins-work-on-the-extension-of-line-3-of-the-madrid-metro-to-getafe\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2022\/02\/Azvi_MetroMadrid_L3.jpg\",\"keywords\":[\"Azvi\",\"Urban transport\"],\"articleSection\":[\"Infrastructure\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/grupoazvinews.com\/en\/azvi-begins-work-on-the-extension-of-line-3-of-the-madrid-metro-to-getafe\/\",\"url\":\"https:\/\/grupoazvinews.com\/en\/azvi-begins-work-on-the-extension-of-line-3-of-the-madrid-metro-to-getafe\/\",\"name\":\"Azvi begins work on the extension of Line 3 of the Madrid Metro to Getafe\",\"isPartOf\":{\"@id\":\"https:\/\/grupoazvinews.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/grupoazvinews.com\/en\/azvi-begins-work-on-the-extension-of-line-3-of-the-madrid-metro-to-getafe\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/grupoazvinews.com\/en\/azvi-begins-work-on-the-extension-of-line-3-of-the-madrid-metro-to-getafe\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2022\/02\/Azvi_MetroMadrid_L3.jpg\",\"datePublished\":\"2022-02-11T09:44:19+00:00\",\"dateModified\":\"2025-11-06T15:24:15+00:00\",\"description\":\"Azvi, Obras Subterr\u00e1neas and Cotodisa has begun work on the extension of Line 3 of the Madrid Metro from Villaverde Alto (Madrid) to El Casar (Getafe).\",\"breadcrumb\":{\"@id\":\"https:\/\/grupoazvinews.com\/en\/azvi-begins-work-on-the-extension-of-line-3-of-the-madrid-metro-to-getafe\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/grupoazvinews.com\/en\/azvi-begins-work-on-the-extension-of-line-3-of-the-madrid-metro-to-getafe\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/grupoazvinews.com\/en\/azvi-begins-work-on-the-extension-of-line-3-of-the-madrid-metro-to-getafe\/#primaryimage\",\"url\":\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2022\/02\/Azvi_MetroMadrid_L3.jpg\",\"contentUrl\":\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2022\/02\/Azvi_MetroMadrid_L3.jpg\",\"width\":1200,\"height\":627},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/grupoazvinews.com\/en\/azvi-begins-work-on-the-extension-of-line-3-of-the-madrid-metro-to-getafe\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/grupoazvinews.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Azvi begins work on the extension of Line 3 of the Madrid Metro to Getafe\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/grupoazvinews.com\/en\/#website\",\"url\":\"https:\/\/grupoazvinews.com\/en\/\",\"name\":\"Grupo Azvi News\",\"description\":\"Grupo Azvi es una empresa centenaria cuyos or\u00edgenes e historia han estado estrechamente vinculados al desarrollo de las infraestructuras de nuestro pa\u00eds. Hoy, se ha convertido en la empresa l\u00edder de un grupo internacional, innovador, diversificado y sostenible.\",\"publisher\":{\"@id\":\"https:\/\/grupoazvinews.com\/en\/#organization\"},\"alternateName\":\"Blog de noticias del Grupo Azvi\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/grupoazvinews.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/grupoazvinews.com\/en\/#organization\",\"name\":\"Grupo Azvi\",\"alternateName\":\"Grupo Azvi\",\"url\":\"https:\/\/grupoazvinews.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/grupoazvinews.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2024\/04\/GrupoAzvi-2018-transp-1.png\",\"contentUrl\":\"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2024\/04\/GrupoAzvi-2018-transp-1.png\",\"width\":1722,\"height\":486,\"caption\":\"Grupo Azvi\"},\"image\":{\"@id\":\"https:\/\/grupoazvinews.com\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/grupoazvinews.com\/en\/#\/schema\/person\/47d326184eb90ffcc4d0639026a97ad8\",\"name\":\"goodland\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/grupoazvinews.com\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/f89fbdeea90efcd70c8b111757e06da47bd4b3a0a656926dbd45ddeed84e25ca?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/f89fbdeea90efcd70c8b111757e06da47bd4b3a0a656926dbd45ddeed84e25ca?s=96&d=mm&r=g\",\"caption\":\"goodland\"},\"sameAs\":[\"https:\/\/grupoazvinews.com\"],\"url\":\"https:\/\/grupoazvinews.com\/en\/author\/goodland\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Azvi begins work on the extension of Line 3 of the Madrid Metro to Getafe","description":"Azvi, Obras Subterr\u00e1neas and Cotodisa has begun work on the extension of Line 3 of the Madrid Metro from Villaverde Alto (Madrid) to El Casar (Getafe).","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/grupoazvinews.com\/en\/azvi-begins-work-on-the-extension-of-line-3-of-the-madrid-metro-to-getafe\/","og_locale":"en_US","og_type":"article","og_title":"Azvi begins work on the extension of Line 3 of the Madrid Metro to Getafe","og_description":"Azvi, Obras Subterr\u00e1neas and Cotodisa has begun work on the extension of Line 3 of the Madrid Metro from Villaverde Alto (Madrid) to El Casar (Getafe).","og_url":"https:\/\/grupoazvinews.com\/en\/azvi-begins-work-on-the-extension-of-line-3-of-the-madrid-metro-to-getafe\/","og_site_name":"NOTICIAS Grupo Azvi","article_published_time":"2022-02-11T09:44:19+00:00","article_modified_time":"2025-11-06T15:24:15+00:00","og_image":[{"width":1200,"height":627,"url":"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2022\/02\/Azvi_MetroMadrid_L3.jpg","type":"image\/jpeg"}],"author":"goodland","twitter_card":"summary_large_image","twitter_misc":{"Written by":"goodland","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/grupoazvinews.com\/en\/azvi-begins-work-on-the-extension-of-line-3-of-the-madrid-metro-to-getafe\/#article","isPartOf":{"@id":"https:\/\/grupoazvinews.com\/en\/azvi-begins-work-on-the-extension-of-line-3-of-the-madrid-metro-to-getafe\/"},"author":{"name":"goodland","@id":"https:\/\/grupoazvinews.com\/en\/#\/schema\/person\/47d326184eb90ffcc4d0639026a97ad8"},"headline":"Azvi begins work on the extension of Line 3 of the Madrid Metro to Getafe","datePublished":"2022-02-11T09:44:19+00:00","dateModified":"2025-11-06T15:24:15+00:00","mainEntityOfPage":{"@id":"https:\/\/grupoazvinews.com\/en\/azvi-begins-work-on-the-extension-of-line-3-of-the-madrid-metro-to-getafe\/"},"wordCount":189,"publisher":{"@id":"https:\/\/grupoazvinews.com\/en\/#organization"},"image":{"@id":"https:\/\/grupoazvinews.com\/en\/azvi-begins-work-on-the-extension-of-line-3-of-the-madrid-metro-to-getafe\/#primaryimage"},"thumbnailUrl":"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2022\/02\/Azvi_MetroMadrid_L3.jpg","keywords":["Azvi","Urban transport"],"articleSection":["Infrastructure"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/grupoazvinews.com\/en\/azvi-begins-work-on-the-extension-of-line-3-of-the-madrid-metro-to-getafe\/","url":"https:\/\/grupoazvinews.com\/en\/azvi-begins-work-on-the-extension-of-line-3-of-the-madrid-metro-to-getafe\/","name":"Azvi begins work on the extension of Line 3 of the Madrid Metro to Getafe","isPartOf":{"@id":"https:\/\/grupoazvinews.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/grupoazvinews.com\/en\/azvi-begins-work-on-the-extension-of-line-3-of-the-madrid-metro-to-getafe\/#primaryimage"},"image":{"@id":"https:\/\/grupoazvinews.com\/en\/azvi-begins-work-on-the-extension-of-line-3-of-the-madrid-metro-to-getafe\/#primaryimage"},"thumbnailUrl":"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2022\/02\/Azvi_MetroMadrid_L3.jpg","datePublished":"2022-02-11T09:44:19+00:00","dateModified":"2025-11-06T15:24:15+00:00","description":"Azvi, Obras Subterr\u00e1neas and Cotodisa has begun work on the extension of Line 3 of the Madrid Metro from Villaverde Alto (Madrid) to El Casar (Getafe).","breadcrumb":{"@id":"https:\/\/grupoazvinews.com\/en\/azvi-begins-work-on-the-extension-of-line-3-of-the-madrid-metro-to-getafe\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/grupoazvinews.com\/en\/azvi-begins-work-on-the-extension-of-line-3-of-the-madrid-metro-to-getafe\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/grupoazvinews.com\/en\/azvi-begins-work-on-the-extension-of-line-3-of-the-madrid-metro-to-getafe\/#primaryimage","url":"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2022\/02\/Azvi_MetroMadrid_L3.jpg","contentUrl":"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2022\/02\/Azvi_MetroMadrid_L3.jpg","width":1200,"height":627},{"@type":"BreadcrumbList","@id":"https:\/\/grupoazvinews.com\/en\/azvi-begins-work-on-the-extension-of-line-3-of-the-madrid-metro-to-getafe\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/grupoazvinews.com\/en\/"},{"@type":"ListItem","position":2,"name":"Azvi begins work on the extension of Line 3 of the Madrid Metro to Getafe"}]},{"@type":"WebSite","@id":"https:\/\/grupoazvinews.com\/en\/#website","url":"https:\/\/grupoazvinews.com\/en\/","name":"Grupo Azvi News","description":"Grupo Azvi es una empresa centenaria cuyos or\u00edgenes e historia han estado estrechamente vinculados al desarrollo de las infraestructuras de nuestro pa\u00eds. Hoy, se ha convertido en la empresa l\u00edder de un grupo internacional, innovador, diversificado y sostenible.","publisher":{"@id":"https:\/\/grupoazvinews.com\/en\/#organization"},"alternateName":"Blog de noticias del Grupo Azvi","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/grupoazvinews.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/grupoazvinews.com\/en\/#organization","name":"Grupo Azvi","alternateName":"Grupo Azvi","url":"https:\/\/grupoazvinews.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/grupoazvinews.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2024\/04\/GrupoAzvi-2018-transp-1.png","contentUrl":"https:\/\/grupoazvinews.com\/wp-content\/uploads\/2024\/04\/GrupoAzvi-2018-transp-1.png","width":1722,"height":486,"caption":"Grupo Azvi"},"image":{"@id":"https:\/\/grupoazvinews.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/grupoazvinews.com\/en\/#\/schema\/person\/47d326184eb90ffcc4d0639026a97ad8","name":"goodland","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/grupoazvinews.com\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/f89fbdeea90efcd70c8b111757e06da47bd4b3a0a656926dbd45ddeed84e25ca?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f89fbdeea90efcd70c8b111757e06da47bd4b3a0a656926dbd45ddeed84e25ca?s=96&d=mm&r=g","caption":"goodland"},"sameAs":["https:\/\/grupoazvinews.com"],"url":"https:\/\/grupoazvinews.com\/en\/author\/goodland\/"}]}},"_links":{"self":[{"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/posts\/15497","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/comments?post=15497"}],"version-history":[{"count":3,"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/posts\/15497\/revisions"}],"predecessor-version":[{"id":19440,"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/posts\/15497\/revisions\/19440"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/media\/14916"}],"wp:attachment":[{"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/media?parent=15497"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/categories?post=15497"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/grupoazvinews.com\/en\/wp-json\/wp\/v2\/tags?post=15497"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}