Cupisa, Grupo Azvi’s electrical and electromechanical installations company in Mexico, is involved in the modernisation of rectifier substations in mass passenger transport systems, carrying out various works on medium-voltage electrical installations rated at 4,600 kVA/4,000 kW, strengthening essential infrastructure for improved safety and efficiency.
- Preliminary works and civil engineering works.
- Installation and connection of cabling.
- Modernisation of rectifier substations.
- Construction and refurbishment of traction equipment enclosures, workshop buildings and test facilities.
- Implementation of SCADA, UPS and HMI systems.
- Integration of circuit breaker circuits.
- Technical inspections, testing and commissioning.
Cupisa’s expertise contributes to strengthening the infrastructure that enables safer, more efficient and reliable mobility for thousands of passengers.