New milestone for Azvi at the La Carlota WWTP: the concreting of the foundation slab for the biological reactor marks a key phase in the development of the project.
What did it involve?
- More than 800 m3 of poured concrete.
- A surface area of 1,163 m2 with a thickness of 70 cm.
- Equipment used: two 52 m telescopic pumps and two teams of operators with a third backup pump.
Due to the high daytime temperatures, work was carried out at night with specialised equipment, once again demonstrating our technical ability and firm commitment to health, safety and excellence at every stage of the project.