Skip links
base de mantenimiento

Azvi and Ispalvia begin work on Renfe’s new maintenance hub in Aranjuez

Azvi and Ispalvia have begun construction of a modern, digitalised maintenance hub for Renfe’s rolling stock.  

The new facility in Aranjuez will be equipped with cutting edge technology and increased capacity to carry out preventive and corrective maintenance operations.  

The project includes the construction of:  

  • Three indoor tracks in the 210 m maintenance hall accommodating trains up to 200 m in length.  
  • Operational parking tracks with capacity for ten 200-metre trains and two 100-metre trains.  
  • One turntable track, a loading and unloading track and a track for washing trains.  
  • Technical platforms, industrial equipment (bogies, track lifts, lifting systems, etc.) and control centre.  
  • Catenary system installation.  
  • A 19 m overpass above Adif’s tracks to ensure accessibility without disrupting rail traffic.
  • An access roundabout and road link with Paseo del Deleite. 

 The facility’s direct connection to the C-3 line of Cercanías Madrid will optimise the flow of trains entering and leaving the station, contributing to more efficient railway operations.  

This project represents a decisive step towards a more agile, efficient and sustainable railway maintenance model, and at Grupo Azvi we are proud to contribute to this advancement in the sector. 

Explorar
Mover
NOTICIAS Grupo Azvi
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.