Skip links

The Madrid Metro Line 3 extension is now a reality!

Azvi, together with OSSA and COTODISA, was part of the team of professionals involved in the construction of this new 2.7 km tunnel section, using a variety of techniques:

  • 1,500 m using the New Austrian Tunnelling
  • 650 m using the Belgian Method.
  • 643 m of Diaphgragm Wall Tunnel.

In addition, a new station has been built at El Casar, which includes:

  • A surface car park with 575 spaces.
  • Charging points for electric vehicles .
  • A direct pedestrian connection to MetroSur Line 12.
  • Links to city and intercity bus services .

This new, strategic infrastructure for the south of Madrid, connects Villaverde Alto and El Casar to Puerta del Sol in under 30 minutes, benefiting more than a million people.

At Azvi, we continue to work towards more efficient and sustainable mobility.

Actuación financiada por la Unión Europea Next Generation- Plan de Recuperación, Transformación y Resiliencia del Ministerio de transportes y Movilidad Sostenible, Gobierno de España en colaboración con la Dirección General de Infraestructuras de Transporte Colectivo de la Consejería de Vivienda, Transportes e Infraestructuras de la Comunidad de Madrid

Explorar
Mover