Skip links

We are in the final stretch of the Las Angosturas bypass in Priego de Córdoba

Built by Azvi, this new 5.6 km section of Las Angosturas bypass in the A-333 will improve road safety, eliminating the existing winding route and providing a more efficient alternative for users.

We are currently completing works on Los Cipreses, a new 740 m bypass designed specifically in response to the discovery of important archaeological remains. This change to the original planned layout ensures their protection .

Latest works in progress:

  • Laying of asphalt agglomerate.
  • Installation of signage and beaconing.
  • Implementation of road containment systems.
  • Concrete on service roads and cattle trails with a gradient >15%.
  • Replacement of greenery in the Los Cipreses area.

Azvi: we build connections that join people and places.

Explorar
Mover