
Second tunnel breakthrough on the San Sebastián Metro
We have reached a new milestone in the San Sebastian Metro project with the breakthrough of the tunnel between Galtzaraborda and the future Pasajes station! This is a key step in the 2.2 km section being executed by Azvi for Euskal Trenbide Sarea (ETS), which








