With 80% of the work completed, we present the latest progress on our section of the Maya Train in Mexico. Great work, great team! Photos: Construcciones Urales.
Grupo Azvi's freight rail operator, Traccion Rail, has joined this interesting campaign, sponsored by Transfesa, which is committed to achieving a decarbonised and more sustainable transport sector. Together with the Port Authority of Algeciras Bay and Marcotran, the initiative was presented in Algeciras on 5
We present the progress of our work on Section 3 (Calkiní-Izamal) of the Maya Train, which we are executing with Grupo Indi. Maya Train. Comprehensive Progress Report on Section 3. Photos: Construcciones Urales.
Azvi continues the expansion of its fleet of heavy track machinery, one of the most complete and advanced in Spain owned by a private company. We have acquired two state-of-the-art machines manufactured by MATISA: a universal high-precision tamping machine with geometry correction capacity, which, among
The Regional Minister of Transport and Infrastructure of the Community of Madrid, David Pérez García, has visited the extension works of Metro de Madrid’s Line 3, from El Casar station (Getafe) to Villaverde Alto (Madrid). The project is being carried out by Azvi, together with
Construcciones Urales and Grupo Indi have begun the positioning and installation of the beams for the first and most impressive of the three railway viaducts that will be built along Section 3, which will allow key existing transport infrastructures to be crossed, such as, in
La empresa de transporte ferroviario de Grupo Azvi ha cerrado 2022 con un crecimiento de su capacidad productiva gracias al aumento de plantilla y de flota. Traccion Rail ha puesto el broche de oro al año 2022 con un aumento de la facturación de un
The Minister of Territorial Planning, Housing and Transport of the Basque Government, Iñaki Arriola, and the Mayoress of Pasaia, Izaskun Gómez, have visited Azvi's works on the extension of the San Sebastian underground. Together with Comsa, Nortúnel and Campezo Obras y Servicios, Azvi is working
Karst formations, caused by the water erosion in the rock, are characteristic of the Yucatan Peninsula in Mexico, where we are building Section 3 of the MayaTrain in consortium with Grupo Indi. In order to protect these unique reliefs, and as part of our commitment
In a joint venture with Acciona, Azvi will build this 17.7 km section of standard gauge double track, which will have seven viaducts and 12 overpasses. Adif will invest more than 133 million Euros in the high-speed connection between Murcia and Cartagena Azvi and Acciona