
Azvi completes track renovation between Muntaner and Las Tres Torres stations in Barcelona
Azvi has carried out track renovation work for Ferrocarrils de la Generalitat de Catalunya (FGC) on the Muntaner-Las Tres Torres section of the Barcelona-Vallès line. The replacement of ballasted track with slab track, with DFF/ADH elastic fastenings, was carried out continuously over 10 days, with








