
Progress in Azvi’s works on the San Sebastian Metro extension
Our team has completed the excavation of the 334-metre Sasuategi ventilation and emergency gallery. This has enabled us to start the works on the 494-metre-long double-track line tunnel which will reach Pasaia station. These works are being carried out with a tunnel boring machine given the particular technical characteristics of








